*Installation appointment : Maximum distance between the bollard and the electrical panel 10m
Charger protection and load shedding imposed by CREOS
To be integrated in the electrical panel
1 drilling concrete wall then test and commissioning.
50% of the purchase price up to 750€ excl. VAT
Key Switch
Stable, durable, reliable
Low price without "frills"